Example Projects - Compliance, Site Investigation,
 Facilities Maintenance

Our projects cover a wide range of environmental issues.  Listed below are some of our past projects.

Removal of Biosolids at MCB Camp Pendleton
NAS Lemoore FOL Pipeline Abandonment
NFD Point Molate Bulk Fuel Tank Cleanout
Generator Day Tank Removal & Replacements - Detroit Arsenal
Erosion Control Sites - SUBASE Point Loma
NAS Lemoore Hydraulic Lift Demolition

SPCC Corrective Actions - Naval Station San Diego
Environmental Baseline Survey - Detroit Arsenal
Groundwater Monitoring - Lawrence Livermore NL

 


Removal of Biosolids
at MCB Camp Pendleton
Cleaned all contaminated WWTP beds (1200 tons)
Met the three-week schedule to meet Base operating demands
Solved landfill destination problems associated with Cal-hazardous waste with coliform

"Your team's responsiveness and quick thinking when confronted by obstacles, and there were many, kept this project on track and completed in a timely manner. we would look forward to doing business with CKY Incorporated for future projects."

NAS Lemoore FOL Pipeline Abandonment
Abandoned 8 miles of underground fiberglass pipeline
Used innovation in lieu of as-builts to locate underground lines
Adjusted from open to confined-space environment
Minimized interference to flight and other operations

"CKY is technically innovative and shows high initiative. 
Kept us informed and used workarounds to keep moving 
forward."

NFD Point Molate Bulk Fuel Tank Cleanout

Removed 14,000 gal 20 yr old tank bottoms

Recovered fuel and disposed of 6500gal sludge

Pressure washed tank and cleared blisters

"CKY performed an efficient and complete effort in the cleaning of Tank ... site hazards [were] addressed completely in its Work Plan and Health and Safety Plan. ... CKY was able to identify problems with the materials and propose alternative methods of material and waste handling. ... CKY made a conscientious effort to keep the customer's interests in mind and make internal adjustments in the tank cleaning process to the satisfaction of the Navy, which is now able to transfer the property to the local reuse authority."

Generator Day Tank Removal & Replacements - Detroit Arsenal
Removed and replaced two ASTs
Placed new concrete pads
Installed secondary containment including tanks and hoses
Completed testing of generator-day tank facility
Restored site to pre-construction condition

 

Erosion Control Sites - SUBASE Point Loma
Provided construction services for CWA compliance
Excavated and constructed controls at 9 sites
Installed geofabric, geocellular material, and coir logs
Hydroseeded selected site with native coastal sage species
Completed project on schedule and under budget


NAS Lemoore Hydraulic
Lift Demolition
Removed and disposed of 3 hydraulic lifts at 2 operational sites
Removed contaminated soil
Closed one site; closure pending at the other
Minimized impact to operations
Completed ahead of schedule

"The project went extremely smoothly and was completed in a timely manner. We had not one complaint from the customer despite both areas being operational. CKY left the sites as good or better than when they arrived. Well documented."

SPCC Corrective Actions - Naval Station San Diego
Provided corrective actions at 8 emergency generator sites
Provided design and construction services
Actions included:
concrete berms 
secondary tanks and rain collars
metal gas station canopies
No interruption to Station operations
Project completed on schedule and under budget

 

Environmental Baseline Survey - Detroit Arsenal
Conducted an arsenal-wide soil gas and soil boring survey
Verified and validated legacy data (soil chemistry and building contaminants)
Developed a web-enabled environmental data base for contracting support
Incorporated a contractor data interface specification and utility
Arsenal now equipped with an easily maintainable environmental record

Groundwater Monitoring - Lawrence Livermore NL